The engineering behind typical jobs
General descriptions of the work involved in situations we commonly see on campuses, estates and business parks. They are not case studies, and no client or site is named. For a named client, read the University of Cambridge case study.
JobSituationWork involvedLeft on site
A new barrier on a staff car park
SituationAn entrance with no control, or with equipment that is beyond economic repair.
Work involvedSurvey of the lane, power and ducting, then the barrier, loops and safety devices installed, set up and commissioned with the site's access control.
Left on siteSettings and test results recorded, and the barrier added to the asset register.
A bollard that drops on its own
SituationIntermittent lowering on a service route, with no clear pattern.
Work involvedHydraulic pressure and valve checks, pit drainage, safety loop sensitivity and controller inputs, tested in turn.
Left on siteThe cause recorded, and the repair made or a costed recommendation.
Doors on Net2, barriers on fobs
SituationStaff carry one token for buildings and another for the car park.
Work involvedAdding readers and wiring the barrier into Net2, then aligning user groups and time zones with the existing door system.
Left on siteOne token for both, with the settings documented.
Gate safety devices keep tripping
SituationA sliding gate reverses or stops part way several times a day.
Work involvedChecking photocell alignment, edge continuity and wiring, then track and rollers, then force on obstruction.
Left on siteDevices tested and the results recorded.
An intercom nobody answers
SituationCalls from an unattended goods entrance ring a phone that is no longer staffed.
Work involvedReviewing call routing against current staffing, checking the network connection and the release from call.
Left on siteRouting set and documented, release tested.
Barrier arm hit by a vehicle
SituationArm broken or bent, with the barrier left open or closed on a busy entrance.
Work involvedMaking the lane safe, fitting a replacement arm, then checking the gearbox, balance and fixings for hidden damage.
Left on siteBarrier back in service, with the damage noted for the site's records.