Estate tools, in development
Eleven ideas for estates and facilities teams who look after barriers, gates and bollards across a whole site. They are set out here so you can see where we are heading. None of them is running yet.
In development
Where things stand
- None of these tools is running yet.
- The first to go live will be the fault report form on this website, opened from a QR label on the equipment.
- We are not giving dates. Each tool will be offered when it works.
The eleven ideas
Each one is described by what it is meant to do. All eleven have the same status today: in development.
- First to go live
QR fault reporting
A label on each barrier, gate or bollard. Scanning it opens a fault report with the site and the asset already filled in, so the report names the right piece of equipment.
- In development
Barrier Master ID
One reference for each asset, used on its label, in its records and on every job, so that everyone means the same barrier.
- In development
Asset management
A register of every barrier, gate, bollard and controller on an estate: what it is, where it is, its condition and its history.
- In development
Staggered planned maintenance
Service visits spread through the year and set by how hard each asset works, so that a whole estate does not fall due at once.
- In development
Job tracking to sign-off and invoice
Each job followed from the first report, through the visit and your sign-off, to the invoice, with one record of what was done.
- In development
Shared Estates dashboard
One view shared with the estates team: the assets, the open faults, the planned visits and the recent work.
- In development
Visitor parking
A way to arrange access for expected visitors, so they are not left waiting at a closed barrier.
- In development
Parking usage and live capacity
Reports on how each car park is used, and a live count of free spaces where a site has the counting equipment to support it.
- In development
Paxton connectivity and diagnostics
A link to a site's Paxton Net2 system, with the site's agreement, so that controllers and readers can be checked without a visit.
- In development
Campus-wide framework and 1, 3 and 5 year plan
One agreed way of working across a whole estate, with a plan for maintenance, upgrades and replacement over one, three and five years.
- In development
Consultancy and project management
Advice on new entrances and replacements before they are specified, and management of the work through to handover.
The fault report form comes first
The enquiry form on this website already has a Report a fault route, and a link on an equipment label can open it with the site and asset filled in. It will be the first of these tools to go live. The example uses sample values, not a real label.
Would one of these solve a problem you have now?
Tell us which one, and what you are dealing with today. It helps us decide what to build first.